Client Case Study
Hillsborough Ct home renovation in Richmond Hill
A Richmond Hill family wanted the whole house to feel new again without moving a single wall. Senso Design replaced the hardwood, took the popcorn off every ceiling, repainted the interior top to bottom, and rebuilt the primary ensuite from the studs. The homeowners walk you through it on camera.
Scope of work
No structural changes, no addition. Just the four things that make a lived-in house feel finished again, done properly and all at once.
| Area | What was done |
|---|---|
| Flooring | Existing hardwood pulled out and replaced with new hardwood, run continuously through the main level and up into the bedrooms so the house reads as one space |
| Ceilings | Popcorn, also called stipple, scraped off every ceiling, then skim coated and finished smooth |
| Painting | Complete interior repaint, walls, trim and ceilings, in a clean neutral palette |
| Primary ensuite | Full renovation from the studs, with a freestanding tub, a glass shower, a double vanity with a makeup station and full height marble |
Watch the homeowners
Just under three minutes, filmed in the home after handover, in their own words. Select the image to play it here.
Budget ranges for work at this level sit in our home renovation cost guide.
What the homeowners asked for
The house was sound and the layout worked. What dated it was underfoot and overhead. Tired hardwood, popcorn ceilings from the era it was built, and paint that had gone tired room by room.
So the brief was not a gut job. It was a refresh with real reach: new floors and smooth ceilings running through the whole house, a fresh coat everywhere, and one room taken all the way, the primary ensuite. Done together while the house was clear, the disruption happens once instead of four separate times.
Popcorn ceilings and dated floors age a house more than almost anything else, and they are the two things buyers and guests notice first.Why homeowners start here

Project at a glance
| Location | Hillsborough Ct, Richmond Hill |
| Project type | Whole home refresh plus a full ensuite renovation |
| Flooring | New hardwood throughout |
| Ceilings | Popcorn removed and finished smooth |
| Painting | Complete interior repaint |
| Primary ensuite | Rebuilt from the studs, freestanding tub, glass shower, double vanity, full height marble |
| Structural changes | None, the work was flooring, ceilings, paint and the ensuite |

Doing the disruptive work once
Hardwood replacement, ceiling scraping and full interior paint are all messy, dusty jobs. The smart move is to run them together, in the right order, so a family lives through it once rather than three times.
The sequence matters. Ceilings come down to smooth first, because scraping popcorn is the dustiest step and you want it done before new floors and fresh paint are in the room. Then paint. Then the new hardwood goes in last on the finished surfaces, protected through the rest of the trades. The ensuite runs on its own track alongside all of it, so the bathroom demolition and tile work never hold up the floors in the bedrooms.
One crew, one schedule, one price agreed before demolition. Nobody waits on an outside trade, and nobody discovers the budget in the middle of the job.How Senso Design runs a project like this
That is the argument for keeping design, scheduling and construction under one roof. It is also why a whole home refresh does not have to mean whole home chaos. For families weighing this against moving, our take on whether to renovate or upgrade first is worth a read before you decide anything.
The finished rooms
The ensuite that got the full treatment, and the floors, ceilings and paint that carry through the rest of the house. All of these are this home.






What this project shows about how we work
Hillsborough Ct is the quiet kind of renovation that changes a whole house. No walls moved, no square footage added, just the right work in the right order, priced up front and finished clean.
The messy work, done once
Ceilings, floors and paint sequenced together so a family lives through the dust a single time.
One room taken all the way
The ensuite rebuilt from the studs on its own track, never holding up the rest of the house.
One team, one fixed price
Design, scheduling and construction under one roof, agreed before demolition starts.
Hear it from the homeowners, in the finished house, in the video above.
Planning something similar nearby? Our Richmond Hill home renovation page covers how we work locally, and our Richmond Hill bathroom renovation page has more on ensuites like this one.

A note on hardwood and smooth ceilings
Two small pieces of advice we give every homeowner weighing this exact project.
On flooring, run the same hardwood continuously wherever you can. A house that changes floor at every doorway feels chopped up, while one continuous surface makes the whole place feel larger and newer than it is. If you are choosing species and finish, our guide to the best hardwoods for a house walks through what wears well in a busy Canadian home.
On ceilings, scraping popcorn is worth it and it is dustier than anyone expects. Older stipple can also contain materials best left to a tested, careful removal, which is one more reason to have it done by a crew that seals the room and cleans up properly rather than tackling it on a weekend. For the ensuite itself, our bathroom renovation service covers the waterproofing and tile work that make a room like this last.
Other homes we have renovated
Different families, different towns, the same design build process.
Cedar Ridge Rd
Kitchen, laundry, two bathrooms and new flooring, told on camera.
View project
Woodbridge full home
Every room in one contract, the way whole home projects usually run.
View project
Planning a refresh like Hillsborough Ct
Tell us what is dating your house, the floors, the ceilings, a tired bathroom. We will plan the work in the right order, do the messy part once, and hand you a fixed price before demolition.




